Field Engineer Intern
- Created the site logistics plan and haul routes for demolition of three high-rises covering 75% of a downtown San Jose city block.
- Ran QA/QC on 30+ rebar details through foundation and slab pours, checking placement against approved shop drawings ahead of inspection.
- Tracked and labeled 1,000+ embeds from delivery to installation, keeping the placement log current for every pour.
- Mapped 30+ overhead utilities across several thousand SF of below-grade structure to scope pre-demolition air gaps and shut-offs.
- Walked the site daily with the superintendent, logging schedule duration changes and flagging conflicts before they hit the critical path.
- Wrote daily reports and photo logs and moved RFIs and submittals between the field and the office.